Product
floor deck forming machine-760
Automatic Decking Floor Roll Forming Machine
We provide high-quality floor deck forming machine, designed for the efficient production of steel decking panels used in industrial buildings, commercial structures, bridges, and other large-scale construction projects. Our machines ensure precision, durability, and high-speed performance, making them ideal for modern construction needs.
The Automatic Steel Deck Roll Forming Machine is engineered to produce various types of metal decking panels, meeting different building requirements. It features strong structural integrity, ensuring the finished decking panels are smooth, free of burrs, and resistant to deformation. The machine operates at a high production speed, reducing labor costs and improving overall efficiency.
Our
Detailed photos
floor deck forming machine
Formed Material
|
GI/GL, PPGI/PPGL
|
Thickness: 0.7-1.5mm, Width: 1000mm(customized) |
Decoiler |
Hydraulic decoiler
|
Manual decoiler(will give you as free)
|
Main body |
Roller station
|
26rows (As your requirement)
|
Diameter of shaft
|
70mm solid shaft
|
|
Material of rollers
|
45# steel, forging with chromium plate 0.05mm,
|
|
Machine body frame
|
400 H Beams
|
|
Cutter
|
Automatic
|
Cr12 Mov quenched treatment 58℃-62℃
|
Power
|
Motor Power
|
15 KW
|
Hydraulic system power
|
4 KW
|
|
Voltage
|
380V 50Hz 3Phase
|
As your requirement
|
Control system
|
Electric Box
|
Delta (As your requirement)
|
Language
|
English, Spanish, etc.(Support multiple languages)
|
|
PLC
|
Automatic production of the whole machine. Can set batch, length, quantity, etc.
|
|
Forming Speed
|
10-15 m/min
|
The speed depends on the shape of the tile and the thickness of the material.
|
|
|
|
|
|
|
Why Choose Us
20+ years of industry development:
Focusing on the research and development of metal roof panel molding equipment, floor deck forming machine customers from more than 150 countries
Full process customization capability:
20+ standard version + customization of drawings, mold development cycle ≤30 days
Global adaptability design:
Supports customization of 220V-415V voltage/50-60Hz frequency, standard CE certification
Quick response service:
72 hours of proofing, 35 days of delivery of standard models, 24 hours of quotation feedback
About us
Engineering Excellence, Global Trust – Built Over 28 Years
Since 1996,HOPEX Xiamen has been at the forefront of designing and manufacturing premium cold roll forming machines for the global construction industry. With over 28 years of engineering expertise, CE and ISO-certified processes, we deliver innovative, high-performance machinery that drives productivity for clients across Europe, the Americas, Africa, and beyond.
FAQ:
Q: Is the equipment internationally certified?
A: Standard CE and ISO certification.
Q: Which countries are currently exporting?
A: The products have been exported to 150 countries including Europe, Middle East, Africa, South America, etc., and are familiar with local customs clearance and installation standards.
Q: Can you provide local client cases or reference projects?
A: Anonymous project videos/pictures can be provided. If you need to refer to them in the same region, you need to communicate in advance and obtain customer consent.
Q: How long is the delivery cycle?
A: 20-30 days for standard models, 35-45 days for customized models (including mold development), which needs to be confirmed in conjunction with the order schedule.
Q: How is the transportation arranged?
A: Supports trade terms such as FOB, CIF, EXW, and can assist in contacting international logistics (freight needs to be calculated separately).
Q: How long does it take to install the equipment? Do you need an engineer to visit you?
A: Basic models can be installed through video guidance, and complex models may require engineers to visit you (the installation cycle is 5-10 days, and the customer needs to bear the travel expenses).
Q: Is operation training provided?
A: Free English operation manual + video tutorial, on-site training of operators can be provided during on-site installation (about 2 days).